Utility Billing
Water Tap Fees
Inside City Limits | Without Concrete/Pavement Break | With Concrete/Pavement Break |
3/4” meter | $525.00 | $1,025.00 |
1” meter | $700.00 | $1,200.00 |
2" meter | $1,415.00 | $1,915.00 |
3” meter & up (City Install) | cost + 20% | cost + $500 + 20% |
3” meter (Private Contractor Install) | $400 + Street Repair | $400 + Street Repair |
* Road bores will be billed based on the cost the City is billed by the contractor
Outside City Limits | Without Concrete/Pavement Break | With Concrete/Pavement Break |
3/4” meter | $700.00 | $1300.00 |
1” meter | $900.00 | $1500.00 |
2" meter | $1,450.00 | $2,050.00 |
3” meter & up (City Install) | cost + 200% | cost + $600 + 200% |
3” meter (Private Contractor Install) | $900 + Street Repair | $900 + Street Repair |
* Road bores will be billed based on the cost the City is billed by the contractor
Sewer Tap Fees
Inside City Limits | Without Concrete/Pavement Break | With Concrete/Pavement Break |
1st tap 6" or larger | $500.00 | $1000.00 |
Each additional tap 6" or larger | $600.00 | $1100.00 |
* Road bores will be billed based on the cost the City is billed by the contractor
Outside City Limits | Without Concrete/Pavement Break | With Concrete/Pavement Break |
1st tap 6" or larger | $600.00 | $1200.00 |
Each additional tap 6" or larger | $700.00 | $1300.00 |
* Road bores will be billed based on the cost the City is billed by the contractor
Commercial Inside City Limits | Without Concrete/Pavement Break | With Concrete/Pavement Break |
1st tap 6" or larger | $700.00 | $1200.00 |
Each additional tap 6" or larger | $800.00 | $1300.00 |
* Road bores will be billed based on the cost the City is billed by the contractor
Commercial Outside City Limits | Without Concrete/Pavement Break | With Concrete/Pavement Break |
1st tap 6" or larger | $900.00 | $1500.00 |
Each additional tap 6" or larger | $1000.00 | $1600.00 |
* Road bores will be billed based on the cost the City is billed by the contractor
Retap Discount | |
If an existing tap fails inspection, a discount in the amount of the inspection fee will be taken off the cost of the new tap. | ($15.00) |
* Road bores will be billed based on the cost the City is billed by the contractor
Sewer Connection | |
Connection to an existing manhole by a contractor or developer. | $700.00 |
* Road bores will be billed based on the cost the City is billed by the contractor